Grinding Roller Coal mill overhauling works Scope of works----- 1. Rollers Housing shaft bearing condition checking 2. Rollers tyres replacement 3. Classifier cone and body welding metal-up where required 4. Mill body inner liner plate or wear plate correction 5 Loading frame and roller centering adjustment work 6 Checking seal air pipe condition 7 Replacement of Bowl ring and re-tight properly 8 Dynamic ring if damage than replace it otherwise metal up by welding on more wear areas 9 Hard facing welding apply on static ring and other grinding areas with N6006 electrodes 10 Mill gear box and motor coupling alignment 11 Fill roller housing oil level in the range 380mm to 460mm 12 Mill main gear box oil level maintain 13 all leakage control gas kits and sealing rope replace. 14 Coal outlet pipe repairing work using putty or any other type of wear guard materials 15 Scraper shoes gap maintain up to 8mm. 16 Feeder outlet chute repairing works here apply welding ...
power plant maintenance works, Power plant equipment maintenance , Boiler , thermal power plant, APH, Coal mill, Steam turbine, Turbine, ESP, CEP pump, Coal fire burner, Steam turbine, FA fan, FD fan, ID fan, Boiler tubes, Tubes leakage, Water tube boiler, Heavy machine maintenance, Power plant generator, Steam turbine governing system, Air Pre-heater, Mechanical engineering, Mechanical works.